Following recent floods, hurricanes and resulting washouts of pipeline backfill and trench support, AMERICAN Ductile Iron Pipe set out to demonstrate the strength and resiliency of ductile iron pipe and the AMERICAN Flex-Ring joint.
Read MoreCategory: AMERICAN Ductile Iron Pipe
Preston Reid has been named Melting Manager for AMERICAN Cast Iron Pipe Company. Reid has worked in various roles in Melting, Ductile Iron Pipe, Maintenance and Steel Pipe.
Read MoreCongratulations to AMERICAN Sales Engineer Joe Zauner on receiving the Jon Eaton Excellence in Volunteering Award from the Minnesota Section of the American Water Works Association.
Read MoreAMERICAN Ductile Iron Pipe/AMERICAN SpiralWeld Pipe Sales Engineer Chris Glassing was presented with the George Warren Fuller Award from the Minnesota Section of the American Water Works Association during the section’s annual conference on September 15, 2022. Established in 1937, […]
Read MoreListen in as AMERICAN Ductile Iron Pipe and AMERICAN SpiralWeld Pipe Marketing Services Manager Maury D. Gaston talks with Water Online about the long-term benefits of iron and steel pipe. Gaston discusses the development of various water pipe materials down […]
Read MoreACIPCO partnered with our neighbors and neighbors as well as Samford and UAB students for cleanup events in our neighboring communities in March.
Read MoreCongratulations to AMERICAN Ductile Iron Pipe/AMERICAN SpiralWeld Pipe Sales Engineer Chris Glassing on receiving the Leonard N. Thompson Award from the Minnesota Section of the American Water Works Association.
Read MoreThe epicenter of iron and steel manufacturing in the U.S. in the late 1800s was Birmingham, Alabama. With its access to raw materials – iron ore, limestone and coal – and a growing rail transportation network, the city’s population and […]
Read MoreCongratulations to Employee Development Specialist Kristie Rankin on her recent reelection as chair of the Central Alabama Partnership for Training and Employment (CAPTE) Board of Directors for Region IV. Rankin’s two-year term began August 18, 2021. She was initially appointed […]
Read MoreMore than 20 years ago, Potosí, Bolivia, embarked on a massive project to bring much-needed water to residents after the area experienced drought on and off for 80 years. The San Juan River Project involved the installation of 170,560 feet of 16-inch and 20-inch AMERICAN Ductile Iron Pipe.
Read More