![The San Juan River Project involved the installation of 52 kilometers [170,560 feet] of 16-inch and 20-inch AMERICAN Ductile Iron Pipe with zinc coating and a pigmented asphalt. Concrete thrusts were installed to anchor the pipe along the entire aqueduct.](/img/asset/YXNzZXRzL3Bvc3RzL3BvdG9zaWJvbGl2aWEtdHdvcGhvdG9zLmpwZw==/potosibolivia-twophotos.jpg?fm=webp&q=100&s=c9e9515f131fcf3d6da1b4b519f86457)
Two Decades Later, AMERICAN Ductile Iron Pipeline Keeps Water and Hope Flowing in Potosí
Aug 5, 2021
More than 20 years ago, Potosí, Bolivia, embarked on a massive project to bring much-needed water to residents after the area experienced drought on and off for 80 years. The San Juan River Project involved the installation of 170,560 feet of 16-inch and 20-inch AMERICAN Ductile Iron Pipe.
Read More